+ Reply to Thread
Results 1 to 2 of 2

Thread: Changing existing project settings

  1. #1

    Changing existing project settings

    Hi - Im new to Bunkspeed Move and have set my project as a HYBRID and would like to reset it as CPU before I continue with development, but I dont see any options to do so.

    How can I change this?

    Thanks in advance!

  2. #2
    Senior Member JohnG's Avatar
    Join Date
    Nov 2011
    Location
    Ireland
    Posts
    161
    Save your project then close it, when you go to reopen it you'll be given the option of Raytracing with CPU, GPU or Hybrid. Choose CPU (or whatever you want), BEFORE opening your project and it will use that option when Raytracing.

+ Reply to Thread

Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts